DETAILS
This project involved the construction of the Aldo Group’s head office and distribution centre with a total of 520,000 square feet of warehouse space and 220,000 square feet of office space in Saint-Laurent. The warehouse is air-conditioned using rooftop units weighing a total of 625 tons. Offices are air-conditioned and heated using 450-ton heat pumps linked to a mixed water network and connected to a water tower with a 500-ton capacity. In addition, interior heating ducts ensure heating of peripheral areas in winter.
-
Location
2300, Émile-Bélanger St., Saint-Laurent
-
Area
740,000 sq.ft.
-
Year
2002-2004
-
Total cost
$60 M
![siegesocial_aldo](https://blondinfortin.ca/wp-content/uploads/2019/08/siegesocial_aldo-600x580.jpg)
![siegesocial_aldo_3](https://blondinfortin.ca/wp-content/uploads/2019/08/siegesocial_aldo_3-600x580.jpg)
![siegesocial_aldo_2](https://blondinfortin.ca/wp-content/uploads/2019/08/siegesocial_aldo_2-600x580.jpg)